OngoingData Centres132kV / 11kV
132kV substation build, hyperscale data centre
Rosehill, NSW
A 132kV connection where the energisation dates are set by the network, not by us.
Nebula holds the full electrical scope for a 132kV substation programme and the construction of a four-bay switchyard, serving a hyperscale data centre operator at Rosehill.
Work at this voltage is only half the difficulty. The programme runs against energisation dates fixed by the network and by the facility behind it, so cabling, primary plant, protection and SCADA all have to arrive at the same hold points together. Self-performing the scope is what makes that possible: the crews installing the switchgear are the crews commissioning the protection on it.
What the scope covered
- Primary and secondary 132kV and 11kV cabling
- 132kV disconnectors and MV switchgear
- Neutral earthing transformers
- SCADA and protection cabinets, built in full
- Circuit breaker timing, partial discharge and VLF high potential testing
Four bays, built and proven by the same team.
Full electrical scope for a 132kV substation programme and construction of a four-bay switchyard.
Installation
Primary and secondary 132kV and 11kV cabling, 132kV disconnectors, MV switchgear and neutral earthing transformers.
Automation
Full construction of SCADA and protection cabinets.
Commissioning
Circuit breaker timing, partial discharge, VLF high potential, transformer tan delta, insulation resistance, primary injection and CT/VT verification.
- Primary and secondary 132kV and 11kV cabling
- 132kV disconnectors and MV switchgear installed
- Neutral earthing transformers installed
- SCADA and protection cabinets constructed
- Circuit breaker timing, partial discharge and VLF high potential
- Transformer tan delta, insulation resistance, primary injection and CT/VT verification
Every Nebula scope is delivered with structured test scripts, hold point sign-off and a full documentation package. Set against the testing performed on this project, that is the pack below.
- Structured test scriptsStandard on every scope
- Hold point sign-offStandard on every scope
- Full documentation packageStandard on every scope
- Circuit breaker timing resultsPer bay
- Partial discharge and VLF high potential resultsPer circuit
- Transformer tan delta and insulation resistance resultsPer unit
- CT/VT verification and primary injection recordsPer protection scheme



Is your scope like this one?
Send the voltage, the site type and the timing. You will hear back from a person who has done the work.
Start an enquiryHow we are set up to deliver it
Capability, sectors, accreditations and the people who carry the technical standard.